Limited review
$2,500 minimum. One subsystem, tightly constrained source set, no broad reconstruction.
First engagement
A fixed-scope engagement for teams facing an unclear system failure, architecture decision, integration problem or stalled verification effort.
Herder reviews the available hardware, firmware, models, logs, requirements and test evidence, then delivers a controlled decision path for what should happen next.
Primary commercial anchor: $5,000-$8,500 for a standard cross-domain assessment. Limited reviews may begin at $2,500 when the scope is tightly bounded. Follow-on implementation is separately scoped.
Start a Technical Discussion →$2,500 minimum. One subsystem, tightly constrained source set, no broad reconstruction.
$5,000-$8,500. Cross-domain review, evidence synthesis, decision report and handoff.
$9,000-$15,000. Multiple interfaces, substantial recovery analysis, or focused testing.
Work begins after scope acceptance and initial payment. Follow-on implementation is separately scoped.
$8,000-$25,000. Directional public anchor for bounded embedded work after the technical boundary is defined.
$20,000-$60,000. Directional public anchor for larger firmware plus internal tooling, logging, analysis or operator software.
$40,000-$100,000+. Directional public anchor for multi-layer delivery with deployment, support and reputational exposure.
$20,000-$40,000. Directional public anchor for power-prototype work, including transformer and bench-validation effort.
These are public anchors only. Exact pricing depends on the controlled baseline, hardware access, robustness requirements, acceptance evidence and support exposure.
Separate what the available evidence supports from what remains a hypothesis.
Determine whether the current system is viable enough to justify continued investment.
Identify whether the blocker is hardware, firmware, controls, power, communications or ownership.
Find which results are configuration-matched, trustworthy and decision-relevant.
Decision, boundary, exclusions, authority, acceptance basis and stop conditions.
Controlled facts, assumptions, warnings, risks and unresolved items.
What is supported, unsupported, uncertain and recommended.
Exact revisions, limitations, recipients, ownership and next-phase evidence.
Evidence supports a defined implementation phase.
A bounded check is required before release or implementation.
The original problem or decision boundary needs correction.
Another path is more appropriate, or further investment is not justified.
Start with the technical question
Describe the system, the decision being delayed and the evidence available. Secure file exchange can follow the initial discussion.
Start a Technical Discussion →Or write directly: [email protected]